C1.Xaml.WPF.GanttView 4.6.20251.887

dotnet add package C1.Xaml.WPF.GanttView --version 4.6.20251.887
                    
NuGet\Install-Package C1.Xaml.WPF.GanttView -Version 4.6.20251.887
                    
This command is intended to be used within the Package Manager Console in Visual Studio, as it uses the NuGet module's version of Install-Package.
<PackageReference Include="C1.Xaml.WPF.GanttView" Version="4.6.20251.887" />
                    
For projects that support PackageReference, copy this XML node into the project file to reference the package.
<PackageVersion Include="C1.Xaml.WPF.GanttView" Version="4.6.20251.887" />
                    
Directory.Packages.props
<PackageReference Include="C1.Xaml.WPF.GanttView" />
                    
Project file
For projects that support Central Package Management (CPM), copy this XML node into the solution Directory.Packages.props file to version the package.
paket add C1.Xaml.WPF.GanttView --version 4.6.20251.887
                    
#r "nuget: C1.Xaml.WPF.GanttView, 4.6.20251.887"
                    
#r directive can be used in F# Interactive and Polyglot Notebooks. Copy this into the interactive tool or source code of the script to reference the package.
#:package C1.Xaml.WPF.GanttView@4.6.20251.887
                    
#:package directive can be used in C# file-based apps starting in .NET 10 preview 4. Copy this into a .cs file before any lines of code to reference the package.
#addin nuget:?package=C1.Xaml.WPF.GanttView&version=4.6.20251.887
                    
Install as a Cake Addin
#tool nuget:?package=C1.Xaml.WPF.GanttView&version=4.6.20251.887
                    
Install as a Cake Tool

About

The ComponentOne WPF GanttView is a project management control designed to efficiently create, schedule, execute and complete projects. The GanttView control is derived from gantt charts, which are one of the oldest and most effective tools for project scheduling and management.

Key Features:

  • Automatic and manual scheduling modes
  • Display percent complete on task bars
  • Create milestones to define landmarks on the schedule
  • Task dependencies to create a relationship between dependent tasks
  • Load and save project schedule as XML
  • A built-in toolbar to help users quickly access various operations that can be performed at runtime

Learn more at developer.mescius.com/componentone/wpf-ui-controls/custom-gantt-view-wpf.

Resources

Product Compatible and additional computed target framework versions.
.NET Framework net462 is compatible.  net463 was computed.  net47 was computed.  net471 was computed.  net472 was computed.  net48 was computed.  net481 was computed. 
Compatible target framework(s)
Included target framework(s) (in package)
Learn more about Target Frameworks and .NET Standard.

NuGet packages

This package is not used by any NuGet packages.

GitHub repositories

This package is not used by any popular GitHub repositories.

Version Downloads Last Updated
4.6.20251.887 260 9/18/2025
4.6.20251.882 135 7/11/2025
4.6.20251.877 213 5/16/2025
4.6.20242.870 150 2/26/2025
4.6.20242.863 161 12/27/2024
4.6.20242.858 166 11/9/2024
4.6.20241.853 181 9/3/2024
4.6.20241.844 177 7/8/2024
4.6.20241.839 159 5/29/2024
4.6.20233.827 177 4/1/2024
4.6.20233.821 157 3/12/2024
4.6.20233.804 189 1/19/2024
4.6.20233.801 244 11/10/2023
4.6.20232.796 199 9/11/2023
4.6.20232.790 225 7/17/2023
4.6.20231.786 382 5/10/2023
4.6.20231.784 406 3/24/2023
4.6.20223.780 348 1/31/2023
4.6.20223.777 400 11/30/2022
4.6.20222.770 526 7/27/2022
4.6.20221.765 522 5/13/2022
4.6.20221.764 541 3/23/2022
4.5.20222.768 508 7/27/2022
4.5.20221.764 524 3/23/2022
4.5.20213.755 434 12/3/2021
4.5.20212.749 437 8/19/2021
4.5.20212.747 417 8/5/2021
4.5.20211.741 458 5/25/2021
4.5.20211.740 423 4/23/2021
4.5.20211.739 425 4/6/2021
4.5.20203.730 551 12/23/2020
4.5.20203.727 506 12/1/2020
4.5.20202.716 551 7/29/2020
4.5.20201.697 716 3/19/2020
4.5.20193.685 662 11/20/2019