C1.Xaml.WPF.GanttView 4.6.20242.870

There is a newer version of this package available.
See the version list below for details.
dotnet add package C1.Xaml.WPF.GanttView --version 4.6.20242.870
                    
NuGet\Install-Package C1.Xaml.WPF.GanttView -Version 4.6.20242.870
                    
This command is intended to be used within the Package Manager Console in Visual Studio, as it uses the NuGet module's version of Install-Package.
<PackageReference Include="C1.Xaml.WPF.GanttView" Version="4.6.20242.870" />
                    
For projects that support PackageReference, copy this XML node into the project file to reference the package.
<PackageVersion Include="C1.Xaml.WPF.GanttView" Version="4.6.20242.870" />
                    
Directory.Packages.props
<PackageReference Include="C1.Xaml.WPF.GanttView" />
                    
Project file
For projects that support Central Package Management (CPM), copy this XML node into the solution Directory.Packages.props file to version the package.
paket add C1.Xaml.WPF.GanttView --version 4.6.20242.870
                    
#r "nuget: C1.Xaml.WPF.GanttView, 4.6.20242.870"
                    
#r directive can be used in F# Interactive and Polyglot Notebooks. Copy this into the interactive tool or source code of the script to reference the package.
#:package C1.Xaml.WPF.GanttView@4.6.20242.870
                    
#:package directive can be used in C# file-based apps starting in .NET 10 preview 4. Copy this into a .cs file before any lines of code to reference the package.
#addin nuget:?package=C1.Xaml.WPF.GanttView&version=4.6.20242.870
                    
Install as a Cake Addin
#tool nuget:?package=C1.Xaml.WPF.GanttView&version=4.6.20242.870
                    
Install as a Cake Tool

About

The ComponentOne WPF GanttView is a project management control designed to efficiently create, schedule, execute and complete projects. The GanttView control is derived from gantt charts, which are one of the oldest and most effective tools for project scheduling and management.

Key Features:

  • Automatic and manual scheduling modes
  • Display percent complete on task bars
  • Create milestones to define landmarks on the schedule
  • Task dependencies to create a relationship between dependent tasks
  • Load and save project schedule as XML
  • A built-in toolbar to help users quickly access various operations that can be performed at runtime

Learn more at developer.mescius.com/componentone/wpf-ui-controls/custom-gantt-view-wpf.

Resources

Product Compatible and additional computed target framework versions.
.NET Framework net462 is compatible.  net463 was computed.  net47 was computed.  net471 was computed.  net472 was computed.  net48 was computed.  net481 was computed. 
Compatible target framework(s)
Included target framework(s) (in package)
Learn more about Target Frameworks and .NET Standard.

NuGet packages

This package is not used by any NuGet packages.

GitHub repositories

This package is not used by any popular GitHub repositories.

Version Downloads Last Updated
4.6.20251.887 275 9/18/2025
4.6.20251.882 145 7/11/2025
4.6.20251.877 223 5/16/2025
4.6.20242.870 160 2/26/2025
4.6.20242.863 171 12/27/2024
4.6.20242.858 176 11/9/2024
4.6.20241.853 191 9/3/2024
4.6.20241.844 187 7/8/2024
4.6.20241.839 169 5/29/2024
4.6.20233.827 187 4/1/2024
4.6.20233.821 167 3/12/2024
4.6.20233.804 199 1/19/2024
4.6.20233.801 254 11/10/2023
4.6.20232.796 210 9/11/2023
4.6.20232.790 235 7/17/2023
4.6.20231.786 394 5/10/2023
4.6.20231.784 416 3/24/2023
4.6.20223.780 358 1/31/2023
4.6.20223.777 410 11/30/2022
4.6.20222.770 536 7/27/2022
4.6.20221.765 532 5/13/2022
4.6.20221.764 551 3/23/2022
4.5.20222.768 518 7/27/2022
4.5.20221.764 534 3/23/2022
4.5.20213.755 444 12/3/2021
4.5.20212.749 448 8/19/2021
4.5.20212.747 428 8/5/2021
4.5.20211.741 469 5/25/2021
4.5.20211.740 434 4/23/2021
4.5.20211.739 436 4/6/2021
4.5.20203.730 562 12/23/2020
4.5.20203.727 517 12/1/2020
4.5.20202.716 562 7/29/2020
4.5.20201.697 727 3/19/2020
4.5.20193.685 674 11/20/2019